1: Peyton Manufacturing estimated its direct materials cost to be $574

1: Peyton Manufacturing estimated its direct materials cost to be $574,293 and its direct labor costs to be $372,841 for the upcoming year. It has also estimated total manufacturing overhead costs to be $176,359. Calculate the predetermined overhead rate if Peyton Manufacturing applies overhead based on direct labor costs.